[Back to previous page]
Generalities
|
|
Details
Part #1:
Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.5 %
- Expected production: 13,580 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Holdorf
- Commissioning:

- 1 turbine: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 8.2 %
- Expected production: 2,930 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Langwege
- City: Dinklage
- Commissioning:

- 2 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: Windstream
Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.8 %
- Expected production: 7,530 kWh
- Values from Weathernews Windcaster solution
Part #4:
- Part: Wie-Wulfenau
- City: Dinklage
- Commissioning:

- 3 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9 %
- Expected production: 11,720 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 39' 40.5"
- Longitude: 8° 2' 53.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 35' 10.5"
- Longitude: 8° 7' 29.2"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Langwege
- Latitude: 52° 39' 39.3"
- Longitude: 8° 7' 22"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Wie-Wulfenau
- Latitude: 52° 39' 39.3"
- Longitude: 8° 7' 22"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 22 August 2022
Complete/correct this sheet: