The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Silmersdorf (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Triglitz
  • Commissioning: 2014/03
  • 5 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height: 105 m
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm
  • Owner: reconcept GmbH

       Production forecast

  • From Monday, December 16 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 26.2 %
  • Expected production: 207,740 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Triglitz
  • Commissioning: 2005
  • 5 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
  • Hub height: 98 m
  • Total nominal power: 7,500 kW
  • Operational
  • Onshore wind farm
  • Developer: SeeBA EnergyFarming
  • Operator: e.n.o. Energy
  • Source: http://www.efiwind.de/index.php?id=118

       Production forecast

  • From Monday, December 16 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 38.1 %
  • Expected production: 68,650 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Triglitz
  • Commissioning: 2005
  • 10 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
  • Hub height: 98 m
  • Total nominal power: 15,000 kW
  • Operational
  • Onshore wind farm
  • Developer: SeeBA EnergyFarming
  • Operator: e.n.o. Energy
  • Source: http://www.efiwind.de/index.php?id=118

       Production forecast

  • From Monday, December 16 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 36.6 %
  • Expected production: 131,700 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Triglitz
  • Commissioning: 2012/10
  • 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 108 m
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm

Part #5:

  • City: Triglitz
  • Commissioning: 2017/01
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 108 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

Localisation


Part #1:

  • Latitude: 53° 15' 4.9"
  • Longitude: 12° 7' 59.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 53° 15' 1"
  • Longitude: 12° 7' 54.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 53° 15' 1"
  • Longitude: 12° 7' 54.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Latitude: 53° 15' 4.9"
  • Longitude: 12° 7' 59.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Latitude: 53° 15' 4.9"
  • Longitude: 12° 7' 59.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 8 April 2019
Complete/correct this sheet: