[Back to previous page]
Details
Part #1:
- City: Aerzen
- Commissioning:

- 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 48.7 %
- Expected production: 21,020 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Aerzen
- Commissioning:

- 3 turbines: Südwind S70/1500 (power 1 500 kW, diameter 70 m)
- Hub height:

- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
- Developer: EBV
Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 47.8 %
- Expected production: 51,580 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 2' 0.2"
- Longitude: 9° 10' 58"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 2' 40.9"
- Longitude: 9° 12' 34.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 16 October 2018
Complete/correct this sheet: