[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: St. Egidien
- Commissioning:

- 2 turbines: Vestas V136/3450 (power 3 450 kW, diameter 136 m)
- Hub height:

- Total nominal power: 7,200 kW (uprated turbines)
- Operational
- Onshore wind farm
Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5.4 %
- Expected production: 9,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Sankt Egidien
- Commissioning:

- 1 turbine: Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height:

- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developer: EAB New Energy Group
- Source:

Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.5 %
- Expected production: 1,240 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Lobsdorf-Grumbach
- City: Callenberg, Sankt Egidien
- Commissioning:

- 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height:

- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
- Developer: EAB New Energy Group
- Source:

Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.4 %
- Expected production: 1,800 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 48' 30.3"
- Longitude: 12° 37' 42.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 50° 48' 53.9"
- Longitude: 12° 38' 3.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Lobsdorf-Grumbach
- Latitude: 50° 48' 57.5"
- Longitude: 12° 37' 49.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: