[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Bentwisch
- Commissioning:

- 3 turbines: Nordex N54/1000 (power 1 000 kW, diameter 54 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, April 20 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.2 %
- Expected production: 3,030 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Bentwisch
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, April 20 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.1 %
- Expected production: 1,460 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 7' 22.9"
- Longitude: 12° 14' 13.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 7' 13.2"
- Longitude: 12° 13' 51.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 January 2019
Complete/correct this sheet: