Wind farms
Großenmarpe (Germany)| Großenmarpe (Germany) |
|
| Operational (6,95 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Blomberg |
| Wind farm type | Onshore wind farm |

![]() | 0.75 MW commissioned |
![]() | 3 MW commissioned |
![]() | 3.2 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E53/800 (x 4) |
| Operational | Repower MD77 (x 2) |
| Operational | Jacobs 48/750 (x 1) |

| No source available |

| City | Blomberg |
| Commissioning | ![]() |
| Turbines | 2x Repower MD77 (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordinates | Latitude 51° 58' 40.3" - Longitude 9° 2' 19.4" |
| Precise localization | Yes |
| City | Blomberg |
| Commissioning | ![]() |
| Turbine | 1x Jacobs 48/750 (power 750 kW, diameter 48.4 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 51° 56' 35.9" - Longitude 9° 5' 48.6" |
| Precise localization | No |
| City | Blomberg |
| Commissioning | ![]() |
| Turbines | 4x Enercon E53/800 (power 800 kW, diameter 52.9 m) |
| Hub height | ![]() |
| Total nominal power | 3,200 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 51° 58' 40.3" - Longitude 9° 2' 19.4" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Püllenberg (0 km) Blomberg (Nordrhein-Westfalen) (1 km) Blomberg-Istrup (4 km) Dörentrup (4 km) Altenkamp (5 km) Barntrup (7 km) Wiembecker Berg (8 km) Lemgo (8 km) Asmissen (8 km) Detmold (9 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Nordrhein-Westfalen : 9,671.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 August 2022 |
||