[Back to previous page]
Generalities
|
|
Details
- City: Bocholt
- Commissioning:

- 5 turbines: Nordex S70 (power 1 500 kW, diameter 70 m)
- Hub height:

- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Operator: Infigen Energy
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 6.8 %
- Expected production: 12,200 kWh
- Values from Weathernews Windcaster solution
Localisation
- Part: Niederrhein
- Latitude: 51° 49' 52"
- Longitude: 6° 31' 40.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 17 August 2022
Complete/correct this sheet: