[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Esterwegen
- Commissioning:

- 5 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Production forecast
- From Sunday, April 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 39.9 %
- Expected production: 86,160 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Börger
- Commissioning:

- 4 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Part #3:
- City: Börger
- Commissioning:

- 7 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 21,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Part #4:
- Part: Windtaler III
- City: Börger
- Commissioning:

- 2 turbines: Enercon E101/3000 (power 3 000 kW, diameter 101 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 56' 15.5"
- Longitude: 7° 35' 52.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 55' 32.5"
- Longitude: 7° 34' 21.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 52° 55' 32.5"
- Longitude: 7° 34' 21.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Part: Windtaler III
- Latitude: 52° 55' 32.5"
- Longitude: 7° 34' 21.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 26 August 2022
Complete/correct this sheet: