[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Bunde
- Commissioning:

- 4 turbines: Senvion 3.4M114 (power 3 400 kW, diameter 114 m)
- Hub height:

- Total nominal power: 13,600 kW
- Operational
- Onshore wind farm
- Developer: Enova
Part #2:
- Part: Bunde
- City: Bunde
- Commissioning:

- 9 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 4,500 kW
- Dismantled
- Onshore wind farm
Part #3:
- Part: Bunde
- City: Bunde
- Commissioning:

- 9 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 20,700 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Production forecast
- From Wednesday, February 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 8.1 %
- Expected production: 40,080 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 11' 58.2"
- Longitude: 7° 13' 50.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Bunde
- Latitude: 53° 11' 56"
- Longitude: 7° 13' 57.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Bunde
- Latitude: 53° 12' 21.1"
- Longitude: 7° 16' 16.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 26 August 2022
Complete/correct this sheet: