Wind farms
Bur (Denmark)| Bur (Denmark) |
|
| Operational (23,3 MW) |

| Country | Denmark |
| County/Zone | Holstebro (Midtjylland) |
| City | Bur |
| Wind farm type | Onshore wind farm |

![]() | 9 MW commissioned |
![]() | 9.9 MW commissioned |
![]() | 4.4 MW commissioned |

| Developer | #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V44/600 (x 15) |
| Operational | Vestas V112/3300 (x 3) |
| Operational | Vestas V100/2200 (x 2) |

![]() | |

| City | Bur |
| Commissioning | ![]() |
| Turbines | 15x Vestas V44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 9,000 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 56° 22' 48" - Longitude 8° 28' 48" |
| Precise localization | Yes |
| City | Bur |
| Commissioning | ![]() |
| Turbines | 3x Vestas V112/3300 (power 3,300 kW, diameter 112 m) |
| Hub height | ![]() |
| Total nominal power | 9,900 kW |
| Status | Operational |
| Coordinates | Latitude 56° 22' 48" - Longitude 8° 28' 48" |
| Precise localization | No |
| City | Bur |
| Commissioning | ![]() |
| Turbines | 2x Vestas V100/2200 (power 2,200 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 4,400 kW |
| Status | Operational |
| Coordinates | Latitude 56° 22' 48" - Longitude 8° 28' 48" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Falsig (2 km) Navr (3 km) Estrup (4 km) Linde (4 km) Idom (5 km) Osterby (Struer) (6 km) Vemb (6 km) Birkild (6 km) Sir (7 km) Fousing (8 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Holstebro (Midtjylland) : 203.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 September 2019 |
||