[Back to previous page]
Details
Part #1:
- City: Sir
- Commissioning:

- 1 turbine: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:

- Total nominal power: 1,650 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 74.7 %
- Expected production: 29,560 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Sir
- Commissioning:

- 1 turbine: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:

- Total nominal power: 1,650 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 74.7 %
- Expected production: 29,560 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 56° 24' 13.4"
- Longitude: 8° 35' 17.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 56° 24' 13.4"
- Longitude: 8° 35' 17.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: