Wind farms
Thonberg (Germany)| Thonberg (Germany) |
|
| Operational (15,2 MW) |

| Country | Germany |
| County/Zone | Sachsen |
| City | Elstra |
| Wind farm type | Onshore wind farm |

![]() | 2.4 MW commissioned |
![]() | 12 MW commissioned |
![]() | 0.8 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Repower MD77 (x 8) |
| Operational | Enercon E40/600 (x 4) |
| Operational | Enercon E53/800 (x 1) |

| No source available |

| City | Elstra |
| Commissioning | ![]() |
| Turbines | 4x Enercon E40/600 (power 600 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 2,400 kW |
| Status | Operational |
| Coordinates | Latitude 51° 14' 34.2" - Longitude 14° 9' 5.9" |
| Precise localization | Yes |
| City | Elstra |
| Commissioning | ![]() |
| Turbines | 8x Repower MD77 (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Coordinates | Latitude 51° 14' 33.5" - Longitude 14° 9' 23.6" |
| Precise localization | Yes |
| City | Elstra |
| Commissioning | ![]() |
| Turbine | 1x Enercon E53/800 (power 800 kW, diameter 52.9 m) |
| Hub height | ![]() |
| Total nominal power | 800 kW |
| Status | Operational |
| Coordinates | Latitude 51° 14' 9.3" - Longitude 14° 9' 5.9" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Elstra (1 km) Jiedlitz (5 km) Crostwitz (6 km) Burkau (8 km) Bischofswerda (9 km) Großhänchen (9 km) Puschwitz (10 km) Cannewitz (10 km) Schönbrunn (16 km) Bernsdorf (17 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Sachsen : 1,484.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 8 August 2022 |
||