[Back to previous page]
Generalities
|
|
Details
- City: Lippetal
- Commissioning:

- 2 turbines: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, February 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 46.6 %
- Expected production: 13,430 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 51° 38' 35.6"
- Longitude: 8° 9' 0.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 September 2022
Complete/correct this sheet: