The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Freren (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Beesten
  • 4 turbines: Enercon E126/4200 (power 4 200 kW, diameter 127 m)
  • Total nominal power: 16,800 kW
  • Operational
  • Onshore wind farm

Part #2:

  • City: Beesten
  • 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
  • Total nominal power: 3,050 kW
  • Operational
  • Onshore wind farm

Part #3:

  • City: Beesten
  • 8 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
  • Total nominal power: 24,000 kW
  • Operational
  • Onshore wind farm

Part #4:

  • Part: Im Bardel
  • City: Freren
  • Commissioning: 2008
  • 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 113.5 m
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WEA GmbH
  • Operator: WEA GmbH
  • Owner: WEA GmbH
  • Source: http://www.wea-gmbh.de/index.php?page=projekt_freren

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 47.8 %
  • Expected production: 91,750 kWh
  • Values from Weathernews Windcaster solution

Part #5:

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 50.6 %
  • Expected production: 194,300 kWh
  • Values from Weathernews Windcaster solution

Part #6:

  • Part: Im Bardel
  • City: Beesten
  • Commissioning: 2010/07
  • 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Hub height: 108 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

Part #7:

  • Part: Im Bardel
  • City: Beesten
  • Commissioning: 2010/07
  • 1 turbine: Enercon
  • Hub height: 108 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

Localisation


Part #1:

  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Part: Im Bardel
  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Part: Im Bardel
  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #6:

  • Part: Im Bardel
  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #7:

  • Part: Im Bardel
  • Latitude: 52° 26' 28.5"
  • Longitude: 7° 33' 32.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 24 October 2019
Complete/correct this sheet: