[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Syitavy
- Commissioning:

- 2 turbines: Dewind D4 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Operator: S & M CZ
- Source:

Production forecast
- From Monday, January 18 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0.6 %
- Expected production: 180 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Syitavy
- Commissioning:

- 2 turbines: Dewind D8.0 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operators: APB-Plzen/S & M CZ
- Source:

Production forecast
- From Monday, January 18 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 30 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Syitavy
- Latitude: 49° 46' 29.6"
- Longitude: 16° 46' 21.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Syitavy
- Latitude: 49° 46' 29.6"
- Longitude: 16° 46' 21.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 December 2020
Complete/correct this sheet: