[Back to previous page]
Details
Part #1:
- City: Grefrath
- Commissioning:

- 2 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Dezentrale Energie
- Source:

Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 46.8 %
- Expected production: 33,720 kWh
- Values from Weathernews Windcaster solution
Part #2:
Part #3:
- City: Grefrath
- Commissioning:

- 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Part #4:
- City: Grefrath
- Commissioning:

- 2 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Technische
Localisation
Part #1:
- Latitude: 51° 20' 57.9"
- Longitude: 6° 18' 54"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 20' 59.7"
- Longitude: 6° 18' 57.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 20' 41.8"
- Longitude: 6° 18' 57.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 20' 41.8"
- Longitude: 6° 18' 57.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 19 February 2020
Complete/correct this sheet: