  • City: Gremersdorf
  • Commissioning: 2004/10
  • 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 80 m
  • Total nominal power: 4,500 kW
  • Operational
  • Onshore wind farm
  • Developer: WIDEMAG
  • Operator: MBBF
  • Source: http://www.mbbf.de/windparks-uebersicht/
  • Source: http://widemag.de

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 46.5 %
  • Expected production: 50,200 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Gremersdorf
  • Commissioning: 2004/10
  • 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 80 m
  • Total nominal power: 4,500 kW
  • Operational
  • Onshore wind farm
  • Developer: WIDEMAG
  • Operator: Gremersdorf Verwaltungs GmbH
  • Source: http://widemag.de

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 46.5 %
  • Expected production: 50,200 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Gremersdorf
  • Commissioning: 2004
  • 5 turbines: Enercon
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WIDEMAG
  • Source: http://widemag.de

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 41.7 %
  • Expected production: 100,120 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Gremersdorf
  • Commissioning: 2003/12
  • 6 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 80 m
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Wotan Gruppe
  • Operator: Wotan Gruppe
  • Source: http://www.wotan-gruppe.de/?page_id=272

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 42.1 %
  • Expected production: 90,930 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Gremersdorf
  • Commissioning: 2015
  • 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm
  • Developer: WPD
  • Source: http://www.wpd.de/referenzen/

Part #6:

  • City: Gremersdorf
  • Commissioning: 2016
  • 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm
  • Developer: WPD
  • Source: http://www.wpd.de/referenzen/

Localisation


Part #1:

  • Latitude: 54░ 19' 56.8"
  • Longitude: 10░ 55' 51.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 54░ 19' 56.8"
  • Longitude: 10░ 55' 51.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 54░ 19' 56.8"
  • Longitude: 10░ 55' 51.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 54░ 19' 59.3"
  • Longitude: 10░ 55' 49.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 54░ 19' 59.3"
  • Longitude: 10░ 55' 49.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 54░ 19' 59.3"
  • Longitude: 10░ 55' 49.5"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 14 June 2017