The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Riepsdorf (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Riepsdorf
  • Commissioning: 2002/03
  • 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 65 m
  • Total nominal power: 3,600 kW
  • Operational
  • Onshore wind farm
  • Operator: RWE
  • Owner: RWE

       Production forecast

  • From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 95.5 %
  • Expected production: 82,540 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Kabelhorst
  • Commissioning: 2001/12
  • 4 turbines: Neg Micon NM64c/1500 (power 1 500 kW, diameter 64 m)
  • Hub height: 68 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Energiequelle

       Production forecast

  • From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 93.1 %
  • Expected production: 100,520 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Riepsdorf, Grömitz
  • Commissioning: 2001
  • 9 turbines: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 13,500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 80.3 %
  • Expected production: 491,620 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Riepsdorf
  • Commissioning: 2000
  • 14 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
  • Hub height: 65 m
  • Total nominal power: 9,240 kW
  • Operational
  • Onshore wind farm

Part #5:

  • City: Grömitz
  • Commissioning: 2000
  • 4 turbines: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm

Part #6:

  • Part: Grömitz-Rüting
  • City: Grömitz
  • Commissioning: 2002/03
  • 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 65 m
  • Total nominal power: 1,800 kW
  • Operational
  • Onshore wind farm
  • Operator: RWE
  • Owner: RWE

       Production forecast

  • From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 95.3 %
  • Expected production: 41,160 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 54° 13' 24.8"
  • Longitude: 10° 56' 53.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 54° 13' 24.8"
  • Longitude: 10° 56' 53.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 54° 13' 24.8"
  • Longitude: 10° 56' 53.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Latitude: 54° 13' 24.8"
  • Longitude: 10° 56' 53.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Latitude: 54° 13' 24.8"
  • Longitude: 10° 56' 53.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #6:

  • Part: Grömitz-Rüting
  • Latitude: 54° 13' 24.8"
  • Longitude: 10° 56' 53.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 29 March 2019
Complete/correct this sheet: