Generalities
|
|
Details
Part #1:
- City: Gistel
- Commissioning:

- 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developer: Aspiravi
- Operator: Aspiravi
- Owner:

- Source:

Production forecast
- From Saturday, December 2 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 4.8 %
- Expected production: 10,590 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Gistel
- Commissioning:

- 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: Electrawinds
- Operators: Ecopower/BeauVent CVBA
- Owners:
/
/
/ND - Source:

- Source:

Production forecast
- From Saturday, December 2 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 5.7 %
- Expected production: 6,290 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 10' 1.5"
- Longitude: 2° 58' 2.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 9' 39.2"
- Longitude: 2° 56' 45.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 19 June 2023
Complete/correct this sheet: