[Back to previous page]
Generalities
|
|
Details
- City: Diksmuide
- Commissioning:

- 2 turbines: Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height:

- Total nominal power: 1,600 kW
- Operational
- Onshore wind farm
- Developer: BeauVent CVBA
- Operator: BeauVent CVBA
- Owner:

- Source:

Production forecast
- From Saturday, December 2 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 7 %
- Expected production: 2,670 kWh
- Values from Weathernews Windcaster solution
Localisation
- Part: De Put
- Latitude: 50° 59' 39.2"
- Longitude: 2° 48' 21.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures

Author: Wim - License: All right reserved
Picture reference: 3252

Author: Wim - License: All right reserved
Picture reference: 3253

Author: Wim - License: All right reserved
Picture reference: 3254

Author: Wim - License: All right reserved
Picture reference: 3255

Author: Wim - License: All right reserved
Picture reference: 3256
Update for this sheet: 15 April 2023
Complete/correct this sheet: