Wind farms
Heidenau (Germany)| Heidenau (Germany) |
|
| Operational (18,2 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Heidenau |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 2 MW commissioned |
![]() | 10.2 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Repower MM82 (x 4) |
| Operational | Senvion 3.4M122 NES (x 3) |

![]() | |

| City | Heidenau |
| Commissioning | ![]() |
| Turbines | 3x Repower MM82 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 53° 19' 6.6" - Longitude 9° 41' 2.9" |
| Precise localization | Yes |
| City | Heidenau |
| Commissioning | ![]() |
| Turbine | 1x Repower MM82 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 53° 19' 6.6" - Longitude 9° 41' 2.9" |
| Precise localization | Yes |
| Part | Heidenau (A1) |
| City | Heidenau |
| Commissioning | ![]() |
| Turbines | 3x Senvion 3.4M122 NES (power 3,400 kW, diameter 122 m) |
| Hub height | ![]() |
| Total nominal power | 10,200 kW |
| Status | Operational |
| Coordinates | Latitude 53° 20' 5.1" - Longitude 9° 36' 54.3" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Halvesbostel (1 km) Regesbostel (5 km) Tostedt (5 km) Wohnste (6 km) Hollenstedt (6 km) AWOMO Bürgerwindpark (8 km) Dierstorf (9 km) Apensen Vestas (11 km) Trelder Berg (11 km) Ohlenbüttel (12 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 22 August 2022 |
||