Generalities
|
|
Details
Part #1:
- City: Freudenberg
- Commissioning:

- 1 turbine: Nordex S77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, June 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.8 %
- Expected production: 2,460 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Freudenberg
- Commissioning:

- 2 turbines: Repower MM82 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, June 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.9 %
- Expected production: 6,580 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Freudenberg
- Commissioning:

- 3 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:

- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Developer: Germania Windpark
- Source:

Production forecast
- From Friday, June 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 10.7 %
- Expected production: 18,500 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 53' 21.8"
- Longitude: 7° 51' 31"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 50° 53' 21.8"
- Longitude: 7° 51' 31"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 50° 53' 50"
- Longitude: 7° 52' 35.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 October 2022