Part #1:
- City: Heiligengrabe
- Commissioning: 1999
- 2 turbines: Südwind S48/600 (power 600 kW, diameter 48 m)
- Hub height: 74 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developers: ImWind/Zopf GmbH
- Operator: Zopf GmbH
- Owner: Zopf GmbH
- Source: http://www.zopf-gmbh.de/htm/Referenzen.htm
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 46.3 %
- Expected production: 13,320 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Heiligengrabe
- Commissioning: 1999
- 1 turbine: Südwind S48/600 (power 600 kW, diameter 48 m)
- Hub height: 74 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developers: ImWind/Zopf GmbH
- Operator: Zopf GmbH
- Owner: Zopf GmbH
- Source: http://www.zopf-gmbh.de/htm/Referenzen.htm
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 42.2 %
- Expected production: 6,080 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Heiligengrabe
- Commissioning: 2001
- 5 turbines: (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 36.5 %
- Expected production: 4,380 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Heiligengrabe
- Commissioning: 2001
- 6 turbines: Nordex N54/1000 (power 1 000 kW, diameter 54 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: EBV
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 42.2 %
- Expected production: 60,750 kWh
- Values from Weathernews Windcaster solution
Part #5:
- City: Heiligengrabe
- Commissioning: 2001
- 3 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 2,550 kW
- Operational
- Onshore wind farm
- Developer: Zopf GmbH
- Operator: Zopf GmbH
- Owner: Zopf GmbH
- Source: http://www.zopf-gmbh.de/htm/Referenzen.htm
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 33.7 %
- Expected production: 20,620 kWh
- Values from Weathernews Windcaster solution
Part #6:
- City: Heiligengrabe
- Commissioning: 2002
- 5 turbines: (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 42.2 %
- Expected production: 40,500 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 32' 12.4"
- Longitude: 12° 32' 37.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 32' 12.4"
- Longitude: 12° 32' 37.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 32' 12.4"
- Longitude: 12° 32' 37.5"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 53° 32' 12.4"
- Longitude: 12° 32' 37.5"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 53° 32' 12.4"
- Longitude: 12° 32' 37.5"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 53° 32' 12.4"
- Longitude: 12° 32' 37.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 18 February 2019