[Back to previous page]
Generalities
|
|
Details
- City: Krefeld
- Commissioning:

- 5 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 3,750 kW
- Operational
- Onshore wind farm
- Developer: Umweltkontor
Production forecast
- From Saturday, December 2 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 12.4 %
- Expected production: 11,150 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 51° 19' 54.1"
- Longitude: 6° 33' 33.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 22 August 2022
Complete/correct this sheet: