Generalities
|
|
Details
Part #1:
- City: Lengerich
- Commissioning:

- 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:

- Total nominal power: 3,050 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 33.3 %
- Expected production: 24,340 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Lengerich
- Commissioning:

- 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Agro-WEA
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 32.1 %
- Expected production: 23,140 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Lengerich
- Commissioning:

- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: Agro-WEA
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 24.5 %
- Expected production: 27,020 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Lengerich
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: Agro-WEA
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 45.7 %
- Expected production: 25,250 kWh
- Values from Weathernews Windcaster solution
Part #5:
- City: Lengerich
- Commissioning:

- 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:

- Total nominal power: 3,050 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 43.9 %
- Expected production: 32,120 kWh
- Values from Weathernews Windcaster solution
Part #6:
- City: Lengerich
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 35.2 %
- Expected production: 19,430 kWh
- Values from Weathernews Windcaster solution
Part #7:
- City: Lengerich
- Commissioning:

- 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:

- Total nominal power: 3,050 kW
- Operational
- Onshore wind farm
- Developer: Agro-WEA
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 35.2 %
- Expected production: 25,760 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 35' 37.5"
- Longitude: 7° 32' 55.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 35' 33.2"
- Longitude: 7° 31' 44.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 52° 35' 22.2"
- Longitude: 7° 32' 14.1"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 52° 35' 44.8"
- Longitude: 7° 31' 52.6"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 52° 35' 53.3"
- Longitude: 7° 32' 30.1"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 52° 35' 59.5"
- Longitude: 7° 32' 17.5"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 52° 36' 10.7"
- Longitude: 7° 32' 14.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 September 2022
Complete/correct this sheet: