[Back to previous page]
Details
Part #1:
Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 67.5 %
- Expected production: 97,250 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Lehe
- Commissioning:

- 4 turbines: Enercon E141/4200 (power 4 200 kW, diameter 141 m)
- Hub height:

- Total nominal power: 16,800 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 0' 1.6"
- Longitude: 7° 19' 56.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 59' 32.8"
- Longitude: 7° 22' 35.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 20 October 2020
Complete/correct this sheet: