[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Lengerich
- Commissioning: 2003
- 3 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Source: http://www.wpd.de/referenzen/
Production forecast
- From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 53 %
- Expected production: 76,280 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Lengerich
- Commissioning: 2000
- 8 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height: 98 m
- Total nominal power: 14,400 kW
- Operational
- Onshore wind farm
- Developer: WEA GmbH
- Operator: WEA GmbH
- Owner: WEA GmbH
- Source: http://www.wea-gmbh.de/index.php?page=projekt_lengerich
Production forecast
- From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 74.8 %
- Expected production: 258,430 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 35' 18.5"
- Longitude: 7° 31' 57.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 35' 18.5"
- Longitude: 7° 31' 57.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 May 2019
Complete/correct this sheet: