[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Meppen
- Commissioning:

- 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Source:

Part #2:
- Part: Meppen
- City: Meppen
- Commissioning:

- 6 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.9 %
- Expected production: 4,910 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Meppen
- City: Meppen
- Commissioning:

- 6 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 4.4 %
- Expected production: 11,310 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 39' 14.1"
- Longitude: 7° 21' 49.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Meppen
- Latitude: 52° 38' 53"
- Longitude: 7° 21' 29.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Meppen
- Latitude: 52° 38' 53"
- Longitude: 7° 21' 29.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view