[Back to previous page]
Details
Part #1:
- City: Neuenkirchen, Sarnow
- Commissioning:

- 15 turbines: Neg Micon NM64/1500 (power 1 500 kW, diameter 64 m)
- Hub height:

- Total nominal power: 22,500 kW
- Operational
- Onshore wind farm
- Developer: e3 GmbH
- Operators: e3 GmbH/Encavis
- Owner:

- Source:

- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 83.4 %
- Expected production: 450,490 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Sarnow
- Commissioning:

- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Source:

Part #3:
- City: Neuenkirchen, Sarnow
- Commissioning:

- 4 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Owner:

- Source:

Localisation
Part #1:
- Latitude: 53° 46' 53.9"
- Longitude: 13° 37' 11.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 46' 28.3"
- Longitude: 13° 38' 54.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 46' 51.6"
- Longitude: 13° 37' 50.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 3 May 2022
Complete/correct this sheet: