Wind farms
Jöhstadt (Germany)| Jöhstadt (Germany) |
|
| Operational (0,8 MW) - Dismantled (2,4 MW) |

| Country | Germany |
| County/Zone | Sachsen |
| City | Jöhstadt |
| Wind farm type | Onshore wind farm |

![]() | 0.4 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 0.5 MW commissioned |
![]() | 0.5 MW decommissioned |
![]() | 1.5 MW decommissioned |
![]() | 0.8 MW commissioned |
![]() | 0.4 MW decommissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E53/800 (x 1) |
| Dismantled | Enercon E40/500 (x 4) |
| Dismantled | Micon M400 (x 1) |

![]() | |
![]() | |

| City | Jöhstadt |
| Commissioning | ![]() |
| Turbines | 3x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Dismantled (2021/01) |
| Coordinates | Latitude 50° 31' 2.2" - Longitude 13° 4' 52.8" |
| Precise localization | No |
| City | Jöhstadt |
| Commissioning | ![]() |
| Turbine | 1x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Dismantled (2013) |
| Coordinates | Latitude 50° 30' 48.8" - Longitude 13° 4' 49.1" |
| Precise localization | No |
| City | Jöhstadt |
| Commissioning | ![]() |
| Turbine | 1x Micon M400 (power 400 kW, diameter 36 m) |
| Hub height | ![]() |
| Total nominal power | 400 kW |
| Status | Dismantled |
| Developer | ![]() |
| Coordinates | Latitude 50° 30' 35.9" - Longitude 13° 4' 48" |
| Precise localization | No |
| City | Jöhstadt |
| Commissioning | ![]() |
| Turbine | 1x Enercon E53/800 (power 800 kW, diameter 52.9 m) |
| Hub height | ![]() |
| Total nominal power | 800 kW |
| Status | Operational |
| Coordinates | Latitude 50° 30' 54.9" - Longitude 13° 4' 48.6" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Marienberg-Satzung (8 km) Hirtstein (8 km) Podmileska Vysina (9 km) Pnisecnice (10 km) Loucna (12 km) Hora Svatého sebestiana (12 km) Großrückerswalde (13 km) Bozi Dar - Neklid II (16 km) Bozi Dar III (16 km) Bozi Dar - Neklid I (16 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Sachsen : 1,484.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 15 September 2025 |
||