[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Nauen
 - Commissioning: 

 - 1 turbine: Wind World W5200/750 (power 750 kW, diameter 52 m)
 - Hub height: 

 - Total nominal power: 750 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Nauen
 - Commissioning: 

 - 11 turbines: Wind World W5200/750 (power 750 kW, diameter 52 m)
 - Hub height: 

 - Total nominal power: 8,250 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- Commissioning: 

 - 10 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
 - Hub height: 

 - Total nominal power: 15,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Umweltkontor
 
Part #4: 
- Commissioning: 

 - 4 turbines: Neg Micon NM82/1500 (power 1 500 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Nauen
 - Commissioning: 

 - 1 turbine: Vestas V52/850 (power 850 kW, diameter 52 m)
 - Hub height: 

 - Total nominal power: 850 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- City: Nauen
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #7: 
- City: Nauen
 - Commissioning: 

 - 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #8: 
- City: Nauen
 - Commissioning: 

 - 4 turbines: Wind World W5200/750 (power 750 kW, diameter 52 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Nauen
 - Commissioning: 

 - 3 turbines: (manufacturer name not available)  
 - Total nominal power: 6,900 kW
 - Operational
 - Onshore wind farm
 
Part #10: 
- City: Nauen
 - Commissioning: 

 - 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #11: 
- Part: Bredow
 - City: Brieselang
 - Commissioning: 

 - 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 - Developer: Zopf GmbH
 - Operator: Zopf GmbH
 - Owner: 

 - Source: 

 
Localisation
Part #1: 
- Latitude: 52° 36' 23.9"
 - Longitude: 12° 52' 31.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 52° 36' 23.9"
 - Longitude: 12° 52' 31.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
Part #4: 
Part #5: 
- Latitude: 52° 35' 39.1"
 - Longitude: 12° 54' 2.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 52° 35' 4.8"
 - Longitude: 12° 48' 45.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Latitude: 52° 36' 37.5"
 - Longitude: 12° 49' 4.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Latitude: 52° 35' 8.3"
 - Longitude: 12° 50' 31.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #9: 
- Latitude: 52° 34' 33"
 - Longitude: 12° 55' 14"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #10: 
- Latitude: 52° 34' 33"
 - Longitude: 12° 55' 14"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #11: 
Update for this sheet: 7 June 2022
Complete/correct this sheet: