[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Norden
- Commissioning:

- 9 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 16,200 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 27.9 %
- Expected production: 108,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Norden
- Commissioning:

- 11 turbines: Tacke TW-500 (power 500 kW, diameter 37 m)
- Total nominal power: 5,500 kW
- Dismantled
- Onshore wind farm
Part #3:
- City: Norden
- Commissioning:

- 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 21.4 %
- Expected production: 23,610 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Norden
- Commissioning:

- 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 37' 59.6"
- Longitude: 7° 15' 15.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 37' 59.6"
- Longitude: 7° 15' 15.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 37' 59.6"
- Longitude: 7° 15' 15.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 37' 59.6"
- Longitude: 7° 15' 15.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 26 August 2022
Complete/correct this sheet: