[Back to previous page]
Details
- City: Nideggen
- Commissioning:

- 2 turbines: Neg Micon NM64/1500 (power 1 500 kW, diameter 64 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 20.9 %
- Expected production: 15,060 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 50° 40' 16.6"
- Longitude: 6° 30' 12.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 March 2019
Complete/correct this sheet: