[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Artlenburg
- Commissioning:

- 5 turbines: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Source:

Production forecast
- From Tuesday, March 28 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 45.5 %
- Expected production: 81,850 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Ostheide
- City: Lehre
- Commissioning:

- 4 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, March 28 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 50.3 %
- Expected production: 72,460 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 21' 11"
- Longitude: 10° 29' 21"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Ostheide
- Latitude: 53° 15' 39.6"
- Longitude: 10° 34' 31.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 November 2022
Complete/correct this sheet: