[Back to previous page]
Generalities
|
|
Details
Part #1:
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 26.4 %
- Expected production: 4,750 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Schotten
- Commissioning:

- 1 turbine: Nordex N54/1000 (power 1 000 kW, diameter 54 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 50° 31' 25"
- Longitude: 9° 7' 25.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 50° 31' 27.8"
- Longitude: 9° 7' 18.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 8 June 2022
Complete/correct this sheet: