[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Seelze
- Commissioning:

- 1 turbine: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Hub height:

- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
Part #2:
Production forecast
- From Sunday, April 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 36 %
- Expected production: 12,980 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Sunday, April 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 37.7 %
- Expected production: 7,700 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 23' 13.2"
- Longitude: 9° 30' 25.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Dedensen
- Latitude: 52° 23' 49.4"
- Longitude: 9° 35' 22.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Dedensen
- Latitude: 52° 23' 49.4"
- Longitude: 9° 35' 22.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 24 August 2022
Complete/correct this sheet: