Wind farms
Steimbke (Germany)| Steimbke (Germany) |
|
| Operational (5 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Steimbke |
| Wind farm type | Onshore wind farm |

![]() | 0.3 MW commissioned |
![]() | 0.45 MW commissioned |
![]() | 4.25 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V52/850 (x 5) |
| Operational | Nordex N27/150 (x 2) |
| Operational | Micon M700-225 (x 2) |

![]() | |
![]() | |

| City | Steimbke |
| Commissioning | ![]() |
| Turbines | 2x Nordex N27/150 (power 150 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Operational |
| Coordinates | Latitude 52° 39' 2.6" - Longitude 9° 23' 45.5" |
| Precise localization | Yes |
| Part | Wendenborstel |
| City | Steimbke |
| Commissioning | ![]() |
| Turbines | 5x Vestas V52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 4,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 52° 38' 59.9" - Longitude 9° 24' 0" |
| Precise localization | Yes |
| Part | Wendenborstel |
| City | Steimbke |
| Commissioning | ![]() |
| Turbines | 2x Micon M700-225 (power 225 kW, diameter 29.8 m) |
| Hub height | ![]() |
| Total nominal power | 450 kW |
| Status | Operational |
| Coordinates | Latitude 52° 38' 27.5" - Longitude 9° 25' 20.5" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Steimbke Ost (1 km) Oldendorf (2 km) Laderholz (2 km) Nöpke (3 km) Bevensen (6 km) Neustadt (6 km) Lutter (6 km) Dudensen (7 km) Neustadt - Lutter (7 km) Wulfelade II (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 2 February 2026 |
||