[Back to previous page]
Generalities
- Wind farm name: Industriehäfen
- Country: Germany
- County / Zone: Bremen
|
|
Details
- City: Bremen
- Commissioning:

- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 17.3 %
- Expected production: 19,140 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 53° 8' 59.1"
- Longitude: 8° 40' 21.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 May 2022
Complete/correct this sheet: