The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Würselen (Germany)


[Back to previous page]

Germany wind farms file

Generalities

PDF

Details


Part #1:

  • City: Würselen
  • Commissioning: 2005
  • 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 100 m
  • Total nominal power: 4,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Energiekontor
  • Operator: Energiekontor
  • Owner: Energiekontor
  • Source: http://www.energiekontor.de/en/references/wind-farms.html

       Production forecast

  • From Friday, November 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 21.1 %
  • Expected production: 22,750 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Würselen
  • Commissioning: 2009/09
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, November 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 25.8 %
  • Expected production: 14,270 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Part: Würselen I-II
  • City: Würselen
  • Commissioning: 2003/11
  • 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 98 m
  • Total nominal power: 3,600 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren
  • Source: https://www.rea-dn.de/Projekte/Windenergie/windpark-wuerselen-broichweiden/

       Production forecast

  • From Friday, November 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 21.6 %
  • Expected production: 18,690 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Part: Würselen III
  • City: Würselen
  • Commissioning: 2009/09
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 98 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren
  • Source: https://www.rea-dn.de/Projekte/Windenergie/windpark-wuerselen-birk/

       Production forecast

  • From Friday, November 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 11.2 %
  • Expected production: 6,190 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 50° 50' 17.9"
  • Longitude: 6° 8' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 50° 49' 4.7"
  • Longitude: 6° 7' 59.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Part: Würselen I-II
  • Latitude: 50° 49' 4.7"
  • Longitude: 6° 7' 59.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Part: Würselen III
  • Latitude: 50° 49' 4.7"
  • Longitude: 6° 7' 59.1"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 12 October 2017
Complete/correct this sheet: