[Back to previous page]
Details
Part #1:
- City: Gumtow
- Commissioning:

- 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
- Developer: Denker&Wulf
Production forecast
- From Sunday, May 22 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 8.2 %
- Expected production: 3,330 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Sunday, May 22 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.3 %
- Expected production: 12,530 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Sunday, May 22 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 13.6 %
- Expected production: 6,550 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Gumtow
- Commissioning:

- 10 turbines: Neg Micon NM52/900 (power 900 kW, diameter 52.2 m)
- Hub height:

- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Schrepkow
- Commissioning:

- 6 turbines: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Hub height:

- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
- Developer: Denker&Wulf
Localisation
Part #1:
- Latitude: 52° 59' 15.7"
- Longitude: 12° 5' 53.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 59' 15.7"
- Longitude: 12° 5' 53.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 52° 59' 15.7"
- Longitude: 12° 5' 53.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 52° 59' 15.7"
- Longitude: 12° 5' 53.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 52° 59' 15.7"
- Longitude: 12° 5' 53.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 16 May 2022
Complete/correct this sheet: