The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Oldendorf (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Holste
  • Commissioning: 2016/12
  • 3 turbines: Enercon E101/3000 (power 3 000 kW, diameter 101 m)
  • Hub height: 135 m
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 14 %
  • Expected production: 35,160 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • Commissioning: 2002/12
  • 6 turbines: (manufacturer name not available)
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 28.8 %
  • Expected production: 62,120 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • Commissioning: 2000
  • 4 turbines: (manufacturer name not available)
  • Total nominal power: 6,600 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 28.8 %
  • Expected production: 45,550 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Bergen an der Dumme, Schnega
  • Commissioning: 2010/11
  • 15 turbines: Enercon E53/800 (power 800 kW, diameter 52.9 m)
  • Hub height: 73 m
  • Total nominal power: 12,000 kW
  • Operational
  • Onshore wind farm
  • Developer: PNE
  • Operator: PNE
  • Owner: EnBW Energie
  • Source: http://www.pnewind.com/unternehmen/referenzen/

       Production forecast

  • From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 31.8 %
  • Expected production: 91,640 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 53° 22' 49.5"
  • Longitude: 8° 48' 26.6"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 53° 35' 26.8"
  • Longitude: 9° 15' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53° 35' 26.8"
  • Longitude: 9° 15' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 52° 53' 10.1"
  • Longitude: 10° 55' 14.3"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 20 March 2019
Complete/correct this sheet: