Generalities
|
|
Details
Part #1:
Production forecast
- From Saturday, April 1 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 89.3 %
- Expected production: 342,780 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Saturday, April 1 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 96.7 %
- Expected production: 278,370 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Litz, Rémérangles
- Commissioning:

- 8 turbines: Vestas V100/2200 (power 2 200 kW, diameter 100 m)
- Total nominal power: 17,600 kW
- Operational
- Onshore wind farm
- Developer: Engie
- Operator: Engie
- Owner:

Localisation
Part #1:
- Latitude: 49° 27' 0.9"
- Longitude: 2° 18' 14.5"
- Altitude: 95/1250 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 49° 27' 0.9"
- Longitude: 2° 18' 14.5"
- Altitude: 95/1250 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 49° 27' 0.9"
- Longitude: 2° 18' 14.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: