[Back to previous page]
Details
Part #1:
- Commissioning:

- 3 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:

- Total nominal power: 7,050 kW
- Operational
- Onshore wind farm
- Developer: Aerotricity Ltd
- Owner:

- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.7 %
- Expected production: 1,190 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Commissioning:

- 3 turbines: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Developer: Aerotricity Ltd
- Owner:

- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.8 %
- Expected production: 480 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 34° 53' 45.1"
- Longitude: 33° 7' 34.8"
- Altitude: 1150 m
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 34° 53' 30.4"
- Longitude: 33° 7' 22.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 April 2022
Complete/correct this sheet: