[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Bourthes, Ergny, Campagnes-lès-Boulonnais
- Commissioning:

- 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developers: Alterric/H2ion/WPD
- Operator: WPD
- Owner:

- Source:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.5 %
- Expected production: 20,900 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Bourthes, Ergny, Campagnes-lès-Boulonnais
- Commissioning:

- 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: Alterric
- Operator: Enercon
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.3 %
- Expected production: 20,280 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 36' 37.1"
- Longitude: 1° 57' 53.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 50° 36' 37.1"
- Longitude: 1° 57' 53.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 23 August 2021
Complete/correct this sheet: