[Back to previous page]
Generalities
|
|
Details
- City: Altefähr
- Commissioning:

- 1 turbine: Nordtank NTK500/41 (power 500 kW, diameter 41 m)
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, September 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 56.7 %
- Expected production: 6,800 kWh
- Values from Weathernews Windcaster solution
Localisation
- Part: Poppelvitz
- Latitude: 54° 20' 52.7"
- Longitude: 13° 8' 29.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: