[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Janneby
- Commissioning:

- 1 turbine: Nordex N117/3000 (power 3 000 kW, diameter 116.8 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Geo Mbh
- Source:

Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 48.5 %
- Expected production: 34,920 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Janneby
- Commissioning:

- 1 turbine: Nordex N100/3300 (power 3 300 kW, diameter 99.8 m)
- Hub height:

- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Developer: Geo Mbh
- Source:

Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 33.4 %
- Expected production: 26,460 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Janneby
- Commissioning:

- 2 turbines: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
- Total nominal power: 6,400 kW
- Operational
- Onshore wind farm
- Developer: Geo Mbh
- Source:

Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 30 %
- Expected production: 46,060 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 38' 0.2"
- Longitude: 9° 19' 18"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 54° 38' 16.9"
- Longitude: 9° 19' 12.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 54° 37' 32.6"
- Longitude: 9° 18' 8.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 23 May 2022
Complete/correct this sheet: