[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Damscheid
- Commissioning:

- 4 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developer: Juwi
- Operator: Juwi
- Owner:

Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 31.9 %
- Expected production: 70,330 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Damscheid
- Commissioning:

- 1 turbine: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height:

- Total nominal power: 3,400 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 31.6 %
- Expected production: 25,810 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Damscheid
- Commissioning:

- 1 turbine: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height:

- Total nominal power: 3,400 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 31.6 %
- Expected production: 25,810 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 5' 32"
- Longitude: 7° 36' 47.4"
- Altitude: 540 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 50° 6' 23.7"
- Longitude: 7° 43' 35.3"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 50° 6' 23.7"
- Longitude: 7° 43' 35.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 8 July 2022
Complete/correct this sheet: