[Back to previous page]
Generalities
- Wind farm name: Kläranlage Seehausen
- Country: Germany
- County / Zone: Bremen
|
|
Details
Part #1:
- Part: Bremen Seehausen 1
- City: Bremen
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Owner:

- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 36.5 %
- Expected production: 20,140 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Bremen Seehausen 2
- City: Bremen
- Commissioning:

- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 29.9 %
- Expected production: 33,010 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Bremen Seehausen 1
- Latitude: 53° 6' 8.5"
- Longitude: 8° 42' 59.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Bremen Seehausen 2
- Latitude: 53° 6' 8.5"
- Longitude: 8° 42' 59.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 9 November 2022
Complete/correct this sheet: