[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 25 turbines: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
- Total nominal power: 115,000 kW (uprated turbines)
- Operational
- Onshore wind farm
- Source:

Localisation
Update for this sheet: 20 June 2024