[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Commissioning:

- 4 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height:

- Total nominal power: 3,400 kW
- Operational
- Onshore wind farm
- Developers: Waterfern Ltd./DP Energy
- Operators: ESB/ESB
- Owner:

- Source:

- Source:

- Source:

- Source:

Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.5 %
- Expected production: 1,210 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Part 2
- Commissioning:

- 8 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height:

- Total nominal power: 6,800 kW
- Operational
- Onshore wind farm
- Developers: Hibernian Wind Power/DP Energy
- Operators: ESB/ESB
- Owner:

- Source:

- Source:

- Source:

- Source:

Production forecast
- From Sunday, June 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.6 %
- Expected production: 2,610 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Part 1
- Latitude: 54° 8' 42.9"
- Longitude: -8° 11' 56"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Part 2
- Latitude: 54° 8' 42.9"
- Longitude: -8° 11' 56"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 January 2023
Complete/correct this sheet: